SEAСРЕДНИЙIN DEVELOPMENT

LCS Gowind-class Corvette

FranceNaval GroupКорвет
ОБЗОР СИСТЕМЫ

Malaysia contracted 6 Gowind-class littoral combat ships in 2011. By 2026, not a single ship has been delivered despite 2x cost overruns and 15+ year delays. Malaysia's largest defence procurement failure.

LCS Gowind-class Corvette
ПОСМОТРЕТЬ В ПОЛНОМ РАЗМЕРЕ
LCS Gowind-class Corvette - Naval Group / Boustead Naval Shipyard
ПРЕИМУЩЕСТВА
  • Sea Fire 500 AESA radar same as FDI
  • Exocet MM40 Block 3 180km range
  • CODAG propulsion for speed
  • Malaysian-assembled at lower cost
  • 5000nm range
НЕДОСТАТКИ
  • Significant delivery delays and cost overruns
  • Troubled Malaysian program history
  • MICA VL integration pending
  • Complex CODAG maintenance for Malaysia
ТЕХНИЧЕСКИЕ ХАРАКТЕРИСТИКИ
CREW99
BEAM M16.5
SENSORThales Sea Fire 500 AESA Radar
ARMAMENTExocet MM40 Block 3 X 8, 57mm Bofors, Mica VL (Pending), 2x Triple Torpedo Tubes, Helicopter
LENGTH M111
RANGE NM5000
PROPULSIONCODAG: 2x MTU 20V Diesels + 2x GE LM2500
SPEED KNOTS25
DISPLACEMENT TONNES3100
СЕМЕЙСТВО СИСТЕМ1 ВАРИАНТ
Discussion & Reviews

Sign in to join the discussion and rate this weapon system

SIGN IN

No comments yet. Be the first to share your analysis.

ПОХОЖИЕ СИСТЕМЫ