نظرة عامة على النظام
Malaysia contracted 6 Gowind-class littoral combat ships in 2011. By 2026, not a single ship has been delivered despite 2x cost overruns and 15+ year delays. Malaysia's largest defence procurement failure.

عرض بالحجم الكامل
LCS Gowind-class Corvette - Naval Group / Boustead Naval Shipyard
المزايا
- Sea Fire 500 AESA radar same as FDI
- Exocet MM40 Block 3 180km range
- CODAG propulsion for speed
- Malaysian-assembled at lower cost
- 5000nm range
العيوب
- Significant delivery delays and cost overruns
- Troubled Malaysian program history
- MICA VL integration pending
- Complex CODAG maintenance for Malaysia
المواصفات التقنية
CREW99
BEAM M16.5
SENSORThales Sea Fire 500 AESA Radar
ARMAMENTExocet MM40 Block 3 X 8, 57mm Bofors, Mica VL (Pending), 2x Triple Torpedo Tubes, Helicopter
LENGTH M111
RANGE NM5000
PROPULSIONCODAG: 2x MTU 20V Diesels + 2x GE LM2500
SPEED KNOTS25
DISPLACEMENT TONNES3100
عائلة الأسلحة1 نسخة
Discussion & Reviews
Sign in to join the discussion and rate this weapon system
SIGN INNo comments yet. Be the first to share your analysis.
أنظمة مشابهة



